Repeatered cable system with power switchable Branch Unit, 1,300 km in total length
100G technology, 30 Tbit/s design capacity
RFS: 2017 Q1
Repaetered solution audited by Axiom consulting
The first subsea cable direct landing at Cambodia
Repeatered cable system with power switchable Branch Unit, 1,300 km in total length
100G technology, 30 Tbit/s design capacity
RFS: 2017 Q1
Repaetered solution audited by Axiom consulting